School Facilities Assessment
& Project Planning
Facilities Advisory Subcommittee Community & Project Planning
Facilities Survey Town Hall Information & Presentations Measure S Presentations Facilities Reports Informational Flyers
Latest News
Measure S Update
February 13, 2017
Measure S continues to make progress in Orange Unified as the Board of Education voted to approve the Phase I scope of work at their regular meeting on December 15. This work includes the construction of new science classrooms/labs, enhanced school site safety, and the elimination of portable classrooms. Additionally, the Board directed staff and the architects to maximize design efficiency and assure equitability across each of the campuses by standardizing the new learning spaces.
The next component of the design process is to address the needs of our special education students. New special education classroom facilities will be added at the three facilities that need them and the fourth high school will have its special education facilities updated. Once the designs are completed, the teams will work with school site staff to test the spaces for functionality with the teachers who will be utilizing them.
While the design validation process with teachers is taking place, the architects will be analyzing the cost-to-life-expectancy of finishes and components that will maximize the District’s long-term investment. Specifying materials that will provide the best durability for cost is clearly important in making sure that the finished products are both cost effective, functional and standardized across each of the campuses. Reducing costs through standardization will conserve the finite Measure S resources for future phases.
Once all of the new learning spaces are defined and quantified, the architects will begin to design the buildings that will house Phase I’s classrooms and labs. Construction managers will then help to eliminate as much of the risk of unforeseen conditions as economically feasible by coordinating site-specific evaluations and soil testing. Upon integration of the work between each site’s architect and construction manager, the project will be analyzed for any possible design element or construction methodology enhancements that could result in savings of time and/or cost while making sure to allow for the safe operation of the school throughout the Phase I construction process.
Measure S Informational Flyers
Presentations
Presented at the Board of Education Meeting Listed
- MeasureS - Fieldman | ROLAPP & Associates: July 7 , 2017
- Facilities Subcommittee Bond Financing Presentations - October 4, 2016
- Bond Feasability Tracking Study - July 14, 2016
- Bond Feasability Tracking Study - May 27, 2016
- School Board Update #5 Facilities Assessment & Funding Project - April 14, 2016
- Fred Kelly Schematic Design - March 10, 2016
- Fred Kelly Stadium Needs - March 10, 2016
- School Board Update #4 Facilities Assessment & Funding Project - March 10, 2016
- School Board Update #3 Facilities Assessment & Funding Project - February 18, 2016
- Bond Feasibility Study - January 21, 2016
- School Board Update #2 Facilities Assessment & Funding Project - January 21, 2016
- School Board Update #1 Facilities Assessment & Funding Project - November 5, 2015
Reports
Presentations from the 10/2/2014 Board of Education Meeting
Fred Kelly Stadium Master Plan
CP Appraisers of Orange Report on School Bond Elections and Home Values
Comprehensive Facilities Master Plan Now Available Online
Additional Reports Added Online!
Overview of the OUSD District-wide Planning Guidelines (2013)
High School Planning Goals (Draft) – October 2013
Comprehensive High Schools Condition Assessment
June 2013 Facilities Condition Assessment by Parsons highlights significant deficiencies in OUSD high school facilities:
- Using a Facilities Condition Index (FCI) measurement, all four high schools were rated Poor.
- One campus has reached, and all four are approaching threshold at which major renovation of demolition must be considered.
- Current total needs is estimated to be at least $199.7 million. If not addressed that estimate rises to $267.0 million in ten years.
Summary of Master Planning Process Overview
OUSD is actively developing site plans for future development of its four comprehensive high schools along with Fred Kelly Stadium.
Plans for each high school will be developed in a way that blends general school needs with the local character and needs of each site.
- Community meetings are taking place to solicit local feedback.
- Each school has a core group of community members, parents, faculty, and staff working with school design architects to build plans.
- Additional community feedback may be provided through www.orangeusd.org.
You need to have Adobe Reader installed to view PDF files.
Please click on the above image to download this free software.